// Modular data centers on distribution power

Everyone is in the same line for power. We are not.

We build modular data centers on power that's available today, from powered land to leased whitespace. Energized in months, not years.

// Capacity · greenfield → whitespace
  1. 01
    Powered land
    + controlled site with contracted distribution power
    Sale or ground lease
  2. 02
    Energized pad
    + medium-voltage feed and fiber to the fence
    Lease
  3. 03
    Modular data hall
    + prefabricated data halls with cooling and backup
    Lease
  4. 04
    Whitespace
    + we own and operate; you bring racks
    Colocation lease per kW of IT
// Why distribution power

Everyone else waits years for power. We don't.

Everyone else · transmission queue

2030+

Power date for a new large load

FiftySixty · distribution power

2027

Power date for the first sites in our pipeline

The line everyone is in

  • Transmission upgrades
  • Community pushback
  • Multi-year builds
  • Procurement bottlenecks

Power that's available today

We site next to existing substations and take distribution-level service. No transmission upgrades, no years in the interconnection queue.

Small enough to fit

Small sites, not gigawatt campuses. They fit the capacity a local grid already has, and they add up across a region.

Built in a factory

Prefabricated data halls are made while the site is prepared. About eight months from notice to proceed to ready for service.

17
Sites in the pipeline
220MW
Pipeline, 2027–29
8mo
Notice to proceed to RFS
0
Transmission upgrades
// The fleet

Small sites, standalone or in clusters

Each site is sized to the capacity its local substation can provide. Where one substation has about 15 MW to spare, a site stands on its own. Smaller ones group into a regional cluster that runs as one campus.

Dallas · 45Missouri · 55Ohio · 30North Carolina · 15New York · 25Connecticut · 10Phoenix · 10Atlanta · 30
From 2027 From 2028Labels in MW · positions approximate
220MW pipeline*
17Sites
150+In prospecting
RegionSitesMWDelivery
Dallas1452027
Missouri7552027–29
Ohio1302027
North Carolina2152027
New York2252027
Connecticut1102027
Phoenix1102027
Atlanta2302028

* US projects only. For more on this pipeline or our European projects, please get in touch.

Substationexisting, utilityfeedersSite · ~15 MW grossswitchgearbackup generationO&M teamon site
Modular data halls Power and backup Cooling On-site O&MSchematic · not to scale

One substation, one site

Where a single substation has enough spare capacity, typically around 15 MW gross, the site stands on its own.

~15MW gross
~12MW IT load
1Team on site

Prefabricated, liquid-cooled data halls sit beside the substation, fed at distribution voltage through on-site switchgear, with backup generation on the same pad.

Reference design, for illustration. Gross is the capacity drawn from the grid; about 12 MW of it reaches the IT load, the rest runs cooling and power systems. Each site is sized to the spare capacity at its substation.

25 min17 min32 min18 min25 minbackup 35 minASite A · 4.0 MWHub 1 · NOC + field teamBSite B · 2.9 MWCSite C · 2.8 MWDSite D · 13.6 MWESite E · 10.3 MWHub 2 · field teamFSite F · 10.3 MWGSite G · 4.2 MW
Phase 1 Phase 2 Phase 1 + expansion O&M hubSchematic · not to scale

Seven sites, one utility

Example cluster: each site is adjacent to a substation within a single utility service territory and utilizes existing substation capacity, ranging from 2.8 MW to 13.6 MW of IT load per site. Taken together, the sites form one 48 MW campus, built in two phases.

48MW IT load
7Sites
2O&M hubs
≤32Min to any site

One network operations center (NOC) monitors every site around the clock. Two field teams, one based at each hub, reach any assigned site within about 30 minutes and provide backup for each other.

Reference design, for illustration. IT load excludes cooling; at the grid the cluster draws about 57 MW.

// What we deliver

Four delivery levels

From greenfield to whitespace on the same site. Each level includes everything before it, so you start where your own team stops.

  1. 01

    Powered land

    A controlled site next to an existing substation, with an executed service agreement for distribution-level power. No transmission upgrades in the path.

    Commercial
    Sale or ground lease
    Suits
    Operators who design and build their own
  2. 02

    Energized pad

    The site graded and permitted, the medium-voltage feed run from the substation, and dark fiber brought to the fence. Ready for modules to land.

    Commercial
    Lease
    Suits
    Operators with their own modular supply
  3. 03

    Modular data hall

    Factory-built data halls with cooling and backup power, specified with the tenant and delivered in about eight months from notice to proceed.

    Commercial
    Lease
    Suits
    Tenants who run their own operations
  4. 04

    Whitespace

    Ready-for-service capacity that we own and operate. You lease kW of IT, bring your racks, and pay for power at cost.

    Commercial
    Colocation lease per kW of IT
    Suits
    Inference and AI cloud tenants
// Partner a site

Got a site near a substation?

Every site in the fleet starts with a partner who knows where the power is. Tell us about yours and we will tell you whether it fits.

Landowners

Land beside a substation or along a distribution line. We buy or lease it, and we carry the permitting, power agreement and build.

Industrial and brownfield sites

An existing site with power service it no longer uses. We turn the spare MW into lease income, on land that is already zoned and connected.

Utilities, co-ops and munis

Spare distribution capacity at a substation. We bring a firm, high-load-factor customer that fits the capacity you already have.

Capital partners

Project equity and debt at the site level, backed by long-term leases with power passed through at cost.

Open farmland with wind turbines on the horizon
// About us

Founding Team

Michael Hochberg
↻Flip

Michael is an infrastructure developer and energy strategist with over 12 years of experience advancing large-scale power projects across the United States and internationally. He has led the development of more than 2 GW of power generation capacity, overseeing projects from site origination and land acquisition through interconnection, permitting, commercial structuring, and financial close, while sourcing and controlling over 30,000 acres of land. At FiftySixty, Michael leads overall strategy and development, drawing on deep experience at the intersection of power markets, grid infrastructure, and large-scale project execution. Michael is also a Visiting Research Fellow at the Oxford Institute for Energy Studies.

Michael Hochberg

CEO

Aviv Sugarman
↻Flip

Aviv is an infrastructure-focused product leader with deep experience building systems that operate at global scale. He founded and scaled an Amazon Ads machine-learning organization, developing core ML and analytics infrastructure used across large production environments, and previously worked on cloud and compute infrastructure at Amazon and Intel. At FiftySixty, Aviv leads product and platform development, ensuring that software, analytics, and decision tools directly accelerate infrastructure origination, development, and operational performance.

Aviv Sugarman

CPO

Christoph Sitter
↻Flip

Christoph is a systems engineer with deep experience building large-scale, mission-critical infrastructure platforms. He has led the design and deployment of high-throughput pricing, trading, and analytics systems across global financial institutions, and previously served as a lead engineer at Amazon, where he built and scaled generative-AI infrastructure powering Amazon Ads. At FiftySixty, Christoph focuses on developing the internal analytics, tooling, and data infrastructure that enable rapid site evaluation, grid analysis, and execution at scale.

Christoph Sitter

CTO

Nicky Montana
↻Flip

Nicky is a serial founder and operator with a track record of scaling companies from formation through exit. He sold his first startup to FuboTV and later served as a General Partner at Zero Knowledge Ventures, where he backed and supported early-stage infrastructure and protocol-driven businesses. At FiftySixty, Nicky oversees operations, partnerships, and capital formation, ensuring that complex, power-intensive projects move efficiently from concept to financeable, executable developments.

Nicky Montana

COO

// Backed by industry leaders

Ambush CapitalLiquid 2 VenturesEntrepreneurs Ventures

Contact FiftySixty

Get in touch with FiftySixty about data center capacity on distribution power: powered land, energized pads, modular data halls and colocation whitespace. We work with AI and inference cloud tenants, data-center operators, landowners, utilities and capital partners.

Careers at FiftySixty

Join FiftySixty and help build the largest fleet of small, modular data centers in the country. We're hiring operators and engineers across development & origination, power & grid engineering, software & platform, permitting & regulatory, capital & finance, and operations. Work on sites from origination through ready for service.