We build modular data centers on power that's available today, from powered land to leased whitespace. Energized in months, not years.
Everyone else · transmission queue
Power date for a new large load
FiftySixty · distribution power
Power date for the first sites in our pipeline
The line everyone is in
We site next to existing substations and take distribution-level service. No transmission upgrades, no years in the interconnection queue.
Small sites, not gigawatt campuses. They fit the capacity a local grid already has, and they add up across a region.
Prefabricated data halls are made while the site is prepared. About eight months from notice to proceed to ready for service.
Each site is sized to the capacity its local substation can provide. Where one substation has about 15 MW to spare, a site stands on its own. Smaller ones group into a regional cluster that runs as one campus.
| Region | Sites | MW | Delivery |
|---|---|---|---|
| Dallas | 1 | 45 | 2027 |
| Missouri | 7 | 55 | 2027–29 |
| Ohio | 1 | 30 | 2027 |
| North Carolina | 2 | 15 | 2027 |
| New York | 2 | 25 | 2027 |
| Connecticut | 1 | 10 | 2027 |
| Phoenix | 1 | 10 | 2027 |
| Atlanta | 2 | 30 | 2028 |
* US projects only. For more on this pipeline or our European projects, please get in touch.
Where a single substation has enough spare capacity, typically around 15 MW gross, the site stands on its own.
Prefabricated, liquid-cooled data halls sit beside the substation, fed at distribution voltage through on-site switchgear, with backup generation on the same pad.
Reference design, for illustration. Gross is the capacity drawn from the grid; about 12 MW of it reaches the IT load, the rest runs cooling and power systems. Each site is sized to the spare capacity at its substation.
Example cluster: each site is adjacent to a substation within a single utility service territory and utilizes existing substation capacity, ranging from 2.8 MW to 13.6 MW of IT load per site. Taken together, the sites form one 48 MW campus, built in two phases.
One network operations center (NOC) monitors every site around the clock. Two field teams, one based at each hub, reach any assigned site within about 30 minutes and provide backup for each other.
Reference design, for illustration. IT load excludes cooling; at the grid the cluster draws about 57 MW.
From greenfield to whitespace on the same site. Each level includes everything before it, so you start where your own team stops.
A controlled site next to an existing substation, with an executed service agreement for distribution-level power. No transmission upgrades in the path.
The site graded and permitted, the medium-voltage feed run from the substation, and dark fiber brought to the fence. Ready for modules to land.
Factory-built data halls with cooling and backup power, specified with the tenant and delivered in about eight months from notice to proceed.
Ready-for-service capacity that we own and operate. You lease kW of IT, bring your racks, and pay for power at cost.
Every site in the fleet starts with a partner who knows where the power is. Tell us about yours and we will tell you whether it fits.
Land beside a substation or along a distribution line. We buy or lease it, and we carry the permitting, power agreement and build.
An existing site with power service it no longer uses. We turn the spare MW into lease income, on land that is already zoned and connected.
Spare distribution capacity at a substation. We bring a firm, high-load-factor customer that fits the capacity you already have.
Project equity and debt at the site level, backed by long-term leases with power passed through at cost.


Michael is an infrastructure developer and energy strategist with over 12 years of experience advancing large-scale power projects across the United States and internationally. He has led the development of more than 2 GW of power generation capacity, overseeing projects from site origination and land acquisition through interconnection, permitting, commercial structuring, and financial close, while sourcing and controlling over 30,000 acres of land. At FiftySixty, Michael leads overall strategy and development, drawing on deep experience at the intersection of power markets, grid infrastructure, and large-scale project execution. Michael is also a Visiting Research Fellow at the Oxford Institute for Energy Studies.

Aviv is an infrastructure-focused product leader with deep experience building systems that operate at global scale. He founded and scaled an Amazon Ads machine-learning organization, developing core ML and analytics infrastructure used across large production environments, and previously worked on cloud and compute infrastructure at Amazon and Intel. At FiftySixty, Aviv leads product and platform development, ensuring that software, analytics, and decision tools directly accelerate infrastructure origination, development, and operational performance.

Christoph is a systems engineer with deep experience building large-scale, mission-critical infrastructure platforms. He has led the design and deployment of high-throughput pricing, trading, and analytics systems across global financial institutions, and previously served as a lead engineer at Amazon, where he built and scaled generative-AI infrastructure powering Amazon Ads. At FiftySixty, Christoph focuses on developing the internal analytics, tooling, and data infrastructure that enable rapid site evaluation, grid analysis, and execution at scale.

Nicky is a serial founder and operator with a track record of scaling companies from formation through exit. He sold his first startup to FuboTV and later served as a General Partner at Zero Knowledge Ventures, where he backed and supported early-stage infrastructure and protocol-driven businesses. At FiftySixty, Nicky oversees operations, partnerships, and capital formation, ensuring that complex, power-intensive projects move efficiently from concept to financeable, executable developments.
Get in touch with FiftySixty about data center capacity on distribution power: powered land, energized pads, modular data halls and colocation whitespace. We work with AI and inference cloud tenants, data-center operators, landowners, utilities and capital partners.
Join FiftySixty and help build the largest fleet of small, modular data centers in the country. We're hiring operators and engineers across development & origination, power & grid engineering, software & platform, permitting & regulatory, capital & finance, and operations. Work on sites from origination through ready for service.